What we do
A tower full of vendors, and one alarm list
A Gurugram corporate tower is usually assembled from systems bought at different times by different people: HVAC from one vendor, lighting control from another, access control and CCTV from a third, and lifts from the OEM. The value of a BMS in that building is not a new dashboard — it is deciding which of those systems deserve to be integrated and producing one alarm list the duty engineer will actually use.
Air quality gives NCR automation a job that other cities do not have. Fresh-air dampers, filtration stages and indoor particulate readings need to be part of the control strategy for part of the year, and the sequence has to protect the fans when filters load. That is a control problem with a seasonal trigger, and it belongs in the design.
What we deliver
- Integration limited to the systems worth integrating, agreed before quotation
- A single alarm list with priority and an owner for each alarm
- Energy metering by floor and by tenant in multi-tenanted towers
- Fresh-air and filtration control that responds to particulate conditions
- Integration with lifts, access control and fire alarm through documented interfaces
- Failure-mode testing of every interface before handover



How to buy automation in an NCR tower
Start with the alarm list you want, not the platform you want. Then ask which existing systems can expose what is needed and which need a gateway at extra cost. A supplier who proposes a full integration before surveying the existing plant is selling a licence, and the commissioning will be where that becomes visible.
Fresh air is a sequence, not a damper
Part of the year the building needs more filtration and less outdoor air; the rest of the year it needs the opposite. Done properly that is a control strategy with particulate sensing, filter pressure monitoring and a protected fan curve. Done badly it is a manual damper that nobody adjusts.
No published NCR automation work
Nothing automated by us is published in Delhi NCR. The design method on this page is the one used elsewhere, and a local reference is not available yet. Our Delhi NCR HVAC page covers the plant, and the MEP page the wider contract.
Sectors
What Delhi NCR asks for
Delhi NCR automation is dominated by corporate towers in Gurugram, mixed-use developments in Noida and redeveloped buildings inside Delhi, where several vendors' systems already coexist. Seasonal air quality adds a control requirement that most other Indian markets do not carry, and high-rise plant rooms add the sequencing problems that come with central chilled water.
Local authorities a Delhi NCR project has to satisfy
- Power
- BSES or Tata Power-DDL in Delhi; DHBVN in Gurugram; UPPCL in Noida
- Fire
- Delhi Fire Service, or the Haryana and Uttar Pradesh fire services
- Municipal
- MCD and DDA in Delhi; the Gurugram and Noida authorities
Approval routes in NCR differ by address — we confirm which authority applies to your site before the programme is fixed.
Frequently asked questions
Can you integrate lifts and access control?
Do we need automation for air quality?
What does a points list cost?
Delhi NCR
Other services in Delhi NCR
The same team and the same contract across the disciplines this site covers.
Pan-India
Explore our locations
Find out more about Mindtech in each city, or send us the site address and we will come back with scope, programme and budget.
Get started
Talk to our engineering team
Send us the drawings or the site address in Delhi NCR and we will come back with scope, programme and budget.