What we do
Three states of wiring, one project
Delhi NCR is not one electricity market. Inside Delhi the supply comes from BSES or Tata Power-DDL; Gurugram sits with the Haryana distribution company; Noida with the Uttar Pradesh one. Each has its own application route, its own inspection practice and its own timeline, and a project team that assumes one path across the region will lose weeks it did not plan for.
The building types differ as sharply. A Gurugram corporate tower needs redundant paths, tenant metering and a changeover that a trading floor will not notice. A Noida electronics plant needs clean earth, harmonic control on a drive-heavy load, and a supply that survives a voltage dip. Both are electrical work and neither is a scaled-up office fit-out.
What we deliver
- HT/LT distribution with a controlled single line diagram and fault level study
- Panels, busbar risers and tenant metering for multi-tenanted towers
- DG sets, AMF and synchronising sized to essential load groups
- Harmonic and power-factor correction for drive-heavy industrial loads
- Clean earth and isolated earth for plants, labs and control rooms
- Load applications and energisation routed to the correct NCR distribution company



How to compare Delhi NCR electrical companies
Ask which distribution company they have energised with before, and in which of the three jurisdictions. Ask for the single line diagram and the fault level study rather than a board schedule. Ask how tenant metering is wired so that the landlord's common-area bill can be defended when a tenant disputes it. The answers say more about capability than a list of completed floors.
Redundancy is a design, not a second cable
Two feeds that arrive on the same tray from the same substation are not redundant. Real redundancy is a different route, a transfer scheme that has been tested on load, and a written procedure for what the facility team does when one source fails. In a tower with a trading floor, that procedure is the deliverable that matters.
No local electrical reference yet
We have not published an electrical project in Delhi NCR. The engineering method on this page is the one used on our other sites, and we would rather tell a client that than imply a Gurugram substation in a tender response. Our Delhi NCR MEP page sets out the wider package.
Sectors
What Delhi NCR asks for
Delhi NCR combines the country's densest corporate market with heavy industrial estates in Noida and Greater Noida and continuous redevelopment inside Delhi. Corporate towers demand redundancy and metering; industry demands power quality and clean earth; redevelopment demands working inside buildings that cannot be shut down. Each comes with a different authority and a different timeline.
Local authorities a Delhi NCR project has to satisfy
- Power
- BSES or Tata Power-DDL in Delhi; DHBVN in Gurugram; UPPCL in Noida
- Fire
- Delhi Fire Service, or the Haryana and Uttar Pradesh fire services
- Municipal
- MCD and DDA in Delhi; the Gurugram and Noida authorities
Approval routes in NCR differ by address — we confirm which authority applies to your site before the programme is fixed.
Frequently asked questions
Which distribution company serves Noida?
Can you do tenant metering in an existing tower?
Do you handle harmonic issues in a plant?
Delhi NCR
Other services in Delhi NCR
The same team and the same contract across the disciplines this site covers.
Pan-India
Explore our locations
Find out more about Mindtech in each city, or send us the site address and we will come back with scope, programme and budget.
Get started
Talk to our engineering team
Send us the drawings or the site address in Delhi NCR and we will come back with scope, programme and budget.